“Which manufacturing orders are open, and what do they still need?”
Three manufacturing orders are open: 45, 46 and 49.
Three manufacturing orders are open: 45, 46 and 49. All are in Main, still in Entered status with no work orders, and nothing has been built on any of them, so each still needs its full bill of materials. All three are past their scheduled dates.
| MO | Scheduled | Builds outstanding (1 batch each) |
|---|---|---|
| 49 | Jul 7 | Chocolate Fudge (25 ea) |
| 45 | Jul 18 | Chocolate Chip (24 ea), Blue Raspberry Lemonade (12 floz) |
| 46 | Aug 8 | Oatmeal Chocolate Chip (200 ea), Chocolate Fudge (25 ea), Sugar Cookie (48 ea), Blue Raspberry Lemonade (12 floz) twice |
Main has enough of most raw goods, but six parts have no stock there, and they block every build on all three orders:
| Raw good | Needed in total | Needed by | Stock elsewhere |
|---|---|---|---|
| BP203 Butter | 48.5 oz | MO 45 (8 oz), MO 46 (40.5 oz) | 3,453 oz each in LA, MI and SLC |
| T1001 Devil's Food Cake mix | 4 lbs | MO 46 (2 lbs), MO 49 (2 lbs) | LA 120 lbs, MI 60 lbs |
| S601 Blue Raspberry Syrup | 3 oz | MO 45 (1 oz), MO 46 (2 oz) | LA 182 oz, MI 91 oz |
| S604 Lemonade Powder Mix | 3 oz (0.19 lbs) | MO 45 (1 oz), MO 46 (2 oz) | LA 195 lbs, MI 98 lbs |
| BP205 Baking Powder | 0.08 oz | MO 46 | LA 185 oz, MI 92 oz |
| Water | 36.33 floz | MO 45 (12.33 floz), MO 46 (24 floz) | None in any location group |
- Transfers cover five of the six: everything but Water is in stock at LA or MI, so moving it to Main clears those shortages without any purchasing.
- Water: it is set up as an inventory part with no stock anywhere, so it will show short on these orders until stock is added or the part setup changes.
- Covered from Main: flour, sugars, eggs, oats, chocolate chips, walnuts, vanilla, baking soda, salt and vegetable oil are all well above what these orders need.
- MO 46: Blue Raspberry Lemonade is on it as two separate one-build lines, which may be a duplicate entry.
Each need was compared against Main's on-hand stock on its own, without netting out what other orders have already allocated.
What else your team could ask
“Can we build 40 batches of chocolate chip cookies (BB2005) by Friday? What's short?”
Yes on materials. Water isn't stocked and Main has no butter, so it shows what to transfer and what else is competing for it.
Watch the answer →“What does one batch of each cookie cost us to make?”
Materials cost per batch and per cookie for every recipe, from $2.23 to $72.64, and butter is what drives it.
Watch the answer →“what were my top product sales, and who bought them?”
Three cookies make up about 77% of your $29,544.54 in product sales, and Allen's Groceries is the main buyer of all three.